Success! Domain msproject.ir was analyzed !

domainsdata.org: صفحه اصلی | شرکت مصورسازان پروژه

  • Title:
    صفحه اصلی | شرکت مصورسازان پروژه
  • Siteadvisor Rating:
    Not Applicable
  • Alexa Rank:
    1,344,847
  • Alexa BackLinks:
    76
  • IP Address:
    64.90.40.97
  • Country of Domain's IP:
  • DMOZ Listing:
    No
  • Domain Registrar:
    NIC-IR
  • Last Modified:
    2021-08-09 5 years 3 months 1 week ago
  • Expiration Date:
    2021-08-09 5 years 3 months 1 week ago
  • Owner's E-Mail:
    [email protected]
    This email is not 100% this domain's owner. We parse first if there is email in whois information (you can see whois data here - msproject.ir Whois Information). If we don't find the owners email there (whois information is protected very often), we parse main, "about us", contact pages until we find the first email there. There is great chance it is the owner's email but not 100%.
Majestic SEO Data:
  • 1. Backlink History Chart from Majestic SEO
  • 2. Referring Domains Discovery Chart from Majestic SEO
Website Inpage Analysis:
  • H1 Headings:
    1
  • H2 Headings:
    11
  • H3 Headings:
    Not Applicable
  • H4 Headings:
    Not Applicable
  • H5 Headings:
    Not Applicable
  • H6 Headings:
    Not Applicable
  • Total IFRAMEs:
    Not Applicable
  • Total Images:
    24
  • Google Adsense:
    Not Applicable
  • Google Analytics:
    UA-15640458-1
64.90.40.97 Data:
  • Hosted IP Address:
    64.90.40.97
  • Hosted Country:
  • Location Latitude:
    33.9302
  • Location Longitude:
    -117.888
  • Location Longitude:
    California, Brea, United States Of America, 92821
Full WHOIS Lookup:
    % This is the IRNIC Whois server v1.6.2.
    % Available on web at http://whois.nic.ir/
    % Find the terms and conditions of use on http://www.nic.ir/
    %
    % This server uses UTF-8 as the encoding forrequests and responses.

    % NOTE: This output has been filtered.

    % Information related to 'msproject.ir'

    domain: msproject.ir
    ascii: msproject.ir
    remarks: (Domain Holder)Mosavar Sazan Project Co
    remarks: (Domain Holder Address) No.33, Abedini Alley, Amrollahi Alley , Bayandariha St, Mohammad Ali Jenah Freeway, Tehran, IR1459734611, IR
    holder-c: ---
    admin-c:am62-irnic
    tech-c: am62-irnic
    bill-c: ar72-irnic
    nserver: ns1.dreamhost.com
    nserver: ns2.dreamhost.com
    nserver: ns3.dreamhost.com
    last-updated: 2019-02-12
    expire-date:2024-02-07
    source: IRNIC # Filtered

    nic-hdl: am62-irnic
    person: Ali Marashi
    e-mail: [email protected]
    address: No. 17, 2nd Floor, Chaharbagh Complex, Chaharbagh St.,, Esfahan,Esfahan, IR
    phone: +98 31 1220 3999
    fax-no: +98 31 1223 0069
    source: IRNIC # Filtered

    nic-hdl: ar72-irnic
    org: Ertebatate Arman Paya
    e-mail: [email protected]
    source: IRNIC #Filtered
msproject.ir Domain Nameserver Information:
  • Nameserver
    IP Address
    Country
  • ns1.dreamhost.com
    162.159.26.14
    United StatesUnited States
  • ns2.dreamhost.com
    162.159.26.81
    United StatesUnited States
  • ns3.dreamhost.com
    162.159.27.84
    United StatesUnited States
DNS Record Analysis:
  • Host
    Type
    TTL
    Extra
  • msproject.ir
    A
    299
    IP: 64.90.40.97
  • msproject.ir
    NS
    14391
    Target: ns1.dreamhost.com
  • msproject.ir
    NS
    14391
    Target: ns3.dreamhost.com
  • msproject.ir
    NS
    14391
    Target: ns2.dreamhost.com
  • msproject.ir
    SOA
    299
    MNAME: ns1.dreamhost.com
    RNAME: hostmaster.dreamhost.com
    Serial: 2021071100
    Refresh: 19438
    Retry: 600
    Expire: 1814400
  • msproject.ir
    MX
    299
    Target: mx2.mailchannels.net
  • msproject.ir
    MX
    299
    Target: mx1.mailchannels.net
  • msproject.ir
    TXT
    296
    TXT:
    MS=00C17AE636846D1A9A74DEFCCDFA96BE9D0FF
    823
  • msproject.ir
    TXT
    296
    TXT: v=spf1 mx
    include:netblocks.dreamhost.com
    include:relay.mailchannels.net -all
HTTP Header Analysis:
  • Http-Version:
    1.1
  • Status-Code:
    200
  • Status:
    200 OK
  • Date:
    Mon, 09 Aug 2021 06:51:47 GMT
  • Server:
    Apache
  • Cache-Control:
    max-age=180, public
  • X-Drupal-Dynamic-Cache:
    MISS
  • Link:
    ; rel="shortlink", ; rel="canonical", ; rel="revision"
  • X-UA-Compatible:
    IE=edge
  • Content-language:
    fa
  • X-Content-Type-Options:
    nosniff
  • X-Frame-Options:
    SAMEORIGIN
  • Expires:
    Sun, 19 Nov 1978 05:00:00 GMT
  • Vary:
    Cookie,Accept-Encoding,User-Agent
  • X-Generator:
    Drupal 8 (https://www.drupal.org)
  • X-Drupal-Cache:
    HIT
  • Upgrade:
    h2
  • Connection:
    Upgrade
  • Last-Modified:
    Sun, 25 Jul 2021 23:08:20 GMT
  • ETag:
    "1627254500-gzip"
  • Content-Encoding:
    gzip
  • Content-Length:
    8821
  • Content-Type:
    text/html; charset=UTF-8
msproject.ir Alexa Data:
  • 1. Alexa Traffic Rank
  • 2. Alexa Search Engine Traffic
  • Alexa Rank:
    1,344,847
  • Alexa BackLinks:
    76
Search Engine Indexes and Search Engine Backlinks:
  • Google Indexed Pages:
    Not Applicable
  • Bing Indexed Pages:
    Not Applicable
  • Google Backlinks:
    Not Applicable
  • Bing Backlinks:
    Not Applicable
Similarly Ranked Websites:

  • 7Mind | Deine App für Meditation & Achtsamkeit

    7Mind bietet dir den einfachsten Einstieg in die Meditation, den du finden kannst. Bring Achtsamkeit in deinen Alltag!

  • Village Square Restaurant & V2 Bar - Winchester, VA

  • Collegiate Strength and Conditioning Coaches Association

    The CSCCa, a non-profit, professional, educational organization for strength and conditioning coaches of collegiate and professional-level athletic teams

  • Not Found

  • Liepājas teātris

    Profesionāls Kurzemes reģionālais muzikāli dramatiskais teātris ar pastāvīgu un augsti kvalificētu trupu, kas piedāvā daudzveidīgu un mākslinieciski bagātu un kvalitatīvu...

Websites Hosted on Same IP (i.e. 64.90.40.97):